Sunday 11 September 2011

Bathroom and Bedroom as they are today

In June 2010, the bedroom walls and ceiling were painstakingly filled and painted. Electrical sockets were improved in May 2011.  Now it is habitable but awaits the oak flooring to be laid on the existing concrete floor. Then skirting board has to be fixed.  French doors / windows await double glazed units and draught insulation. The radiator has to be replaced and some boxing in of plumbing pipes needs to be achieved. The ceiling is beautiful.
The bathroom awaits completion.